Hi Everyone!
All is progressing at a steady rate; despite the rain.
1. For the last three days Rafael and Aaron have been working on fuel plumbing. One more day and night might finish the job.
2. Billy working on water plumbing to the engines. Both Auxiliaries and two mains are done. Starboard main should be done by end of today.
3. Tom Date and Greg Hibbs are finishing alignment and bolting down engines. Should be done by end of today. (It was a three day job.)
4. Roy and Eddie taking down remaining insulation in overhead of engine room. Lagger starts on new insulation, in engine room, Wednesday. $10,000 job
5. Aaron also helping Tom Ebner with exhausts. Fiberglassing elbows, running 12??? hose, etc. After completing the starboard engine today, all engines will have exhausts.
6. Painters painting topside (if it does not rain.) Also applying fiberglass bondo to deck.
7. Big ???D??? finished all varnish work in galley and went home.
8. Cole sanding Teak on tackle bench and cleaning engine room. Also gathering all carpeting for cleaning.
9. Roy fiberglassing new box built by Danny for holding bags of salt in water tank compartment.
10. Frank and Steve chasing parts, working on boat, lining up outside work and approving bills for Scotty and Andrea to pay.
All is progressing at a steady rate; despite the rain.
1. For the last three days Rafael and Aaron have been working on fuel plumbing. One more day and night might finish the job.
2. Billy working on water plumbing to the engines. Both Auxiliaries and two mains are done. Starboard main should be done by end of today.
3. Tom Date and Greg Hibbs are finishing alignment and bolting down engines. Should be done by end of today. (It was a three day job.)
4. Roy and Eddie taking down remaining insulation in overhead of engine room. Lagger starts on new insulation, in engine room, Wednesday. $10,000 job
5. Aaron also helping Tom Ebner with exhausts. Fiberglassing elbows, running 12??? hose, etc. After completing the starboard engine today, all engines will have exhausts.
6. Painters painting topside (if it does not rain.) Also applying fiberglass bondo to deck.
7. Big ???D??? finished all varnish work in galley and went home.
8. Cole sanding Teak on tackle bench and cleaning engine room. Also gathering all carpeting for cleaning.
9. Roy fiberglassing new box built by Danny for holding bags of salt in water tank compartment.
10. Frank and Steve chasing parts, working on boat, lining up outside work and approving bills for Scotty and Andrea to pay.
If you would like to go fishing with us please BOOK ONLINE or call (619) 226-8092 to get in on the action.
< Previous Report Next Report >
More Reports
5-23-2008We would like to welcome our newest sponsor! Thanks to Frank Lopreste for the support. Stay tuned for on water the reports from Frank and Roy on the Royal Polaris all season longa...... Read More
5-21-2008
Hi folks; Tuesday was a very hectic day with the entire crew starting at 7:30am and finishing around 7:00pm. The welders had to return because the American Bureau of shipping found 3 pinholes in the welding of the center engine hatch. Those areas had to be grooved and re-welded. One auxiliary engine is completely ready to go for splashdown today (Wednesday). Big D completed the bridge varnishing. Anthony and D spent part of the day varnishing the galley. Eddie and one electrician pulled wires to instruments in bridge....... Read More
Hi folks; Tuesday was a very hectic day with the entire crew starting at 7:30am and finishing around 7:00pm. The welders had to return because the American Bureau of shipping found 3 pinholes in the welding of the center engine hatch. Those areas had to be grooved and re-welded. One auxiliary engine is completely ready to go for splashdown today (Wednesday). Big D completed the bridge varnishing. Anthony and D spent part of the day varnishing the galley. Eddie and one electrician pulled wires to instruments in bridge....... Read More